INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

100 kg Industrial Dryer: What a Project Site Survey Should Include

A 100 kg dryer survey should document delivery access, final position, service clearances, utilities and the proposed exhaust route.

A 100 kg dryer survey should document delivery access, final position, service clearances, utilities and the proposed exhaust route. Include the textile flow from washing and the handling of completed loads. Record physical restrictions with measured drawings and photographs. Give the equipment supplier and installation team the same survey so their assumptions do not diverge.

The survey should identify who provides each service and who checks readiness. This avoids a 100 kg dryer arriving while essential connection or access questions remain unresolved.

Preparing your comparison

A project survey should distinguish equipment dimensions from operating space and from the route used to bring the machine inside. Record each restriction and the person responsible for resolving it. Include the final location, utility schedule and planned commissioning sequence. Where the 100 kg dryer receives work from several washers, also show their release pattern so the proposed capacity can be assessed against actual arrivals rather than their combined nameplate totals.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation