A 15 kg dryer may suit separately processed towel batches when the drum and approved loading conditions match their bulk. Weigh towels dry and record their condition after extraction. Compare complete batch turnaround, including cooling and unloading, with the washer schedule. Avoid assuming a fixed towel count because towel dimensions and construction can change the load substantially.
Observe when towel loads leave the washer. Matching the dryer's batch rhythm to those arrivals is more useful than comparing the two machines' nominal capacities in isolation.
Back to news & insights