Record capacity, heat source, electrical requirements, controls, dimensions and all approved changes in one configuration document. Attach the agreed inspection scope and unresolved exclusions. Confirm who approved the final revision. This gives production and installation teams the same reference and prevents a later quotation update from silently changing an accepted technical decision.
Keep the final configuration, drawings and acceptance record together. This prevents a later discussion from relying on a preliminary option that was considered but never included in the approved dryer.
Back to news & insights