Drum space allows textiles to lift, fall and separate during a compatible drying process. The practical requirement varies with item size and construction, not just mass. Ask whether bulky articles can move as intended at the proposed load. A drum that appears full before operation may not provide the movement needed for repeatable drying across the batch.
Evaluate the textile's movement within the approved trial process. Drum litres are useful specifications, but their relevance becomes clearer when the buyer describes the size and construction of the goods.
Back to news & insights