A product family may contain different heating configurations, and not every option is available on every model. Request written confirmation of the quoted arrangement and its connection requirements. Check it against site conditions before ordering. A general catalogue reference to gas, electric or steam should not be treated as approval of a particular combination.
Request the heating option as part of the written model configuration. A feature shown elsewhere in a product range should not be assumed to be included in the particular quotation.
Back to news & insights