A batch log can separate machine time from waiting time. Record load readiness, loading, cycle completion and unloading, alongside the textile group and dry weight. Repeated gaps after completion suggest a different issue from long operating cycles. Review the sequence before buying capacity; changes to staffing or trolley availability may address the delay more directly.
Use a small number of clear delay categories such as waiting for sorted work, unloading or service. Consistent categories make the log actionable without asking operators to write long narratives.