Commercial Tumble Dryer
Available capacities: 12 / 15 / 20 / 30 kg.

Programmable temperature, drying time and cooling, with a reversing drum, wide loading door and accessible lint filter. Heating and control configurations are confirmed for the selected model.
Capacity options
- 12 kg — GZP-12; drum: 221 L.
- 15 kg — GZP-15; drum: 298 L.
- 20 kg — GZP-20; drum: 395 L.
- 30 kg — GZP-30; drum: 600 L.
Model selection
Select a capacity to match the washer discharge and textile volume. Drying time depends on fabric, incoming moisture and load size. Dimensions, heating, electrical supply, exhaust and make-up-air requirements vary by model. Request the current technical sheet and installation drawing. OEM and ODM enquiries are welcome.
Need a technical data sheet? Include your destination, available power supply and required capacity in your enquiry.
What’s next for your laundry?
Let’s find the equipment that fits your project.
