Commercial Washer-Extractor
Available capacities: 15 / 20 / 25 / 30 kg.

Washing and extraction in one machine, with a suspended drum, inverter-controlled speed, programmable controls, chemical dispensing and a door interlock. Controller, heating and dispensing configurations are confirmed for the selected model.
Capacity options
- 15 kg — XGQ-15F; drum: 153 L; extraction speed: 800 rpm.
- 20 kg — XGQ-20F; drum: 208 L; extraction speed: 800 rpm.
- 25 kg — XGQ-25F; drum: 252 L; extraction speed: 800 rpm.
- 30 kg — XGQ-30F; drum: 318 L; extraction speed: 800 rpm.
Model selection
Choose a capacity for your largest sorted batch and textile type. Dimensions, electrical supply, water, drainage and foundation requirements vary by model. Request the current technical sheet and installation drawing with your quotation. OEM and ODM enquiries are welcome.
Need a technical data sheet? Include your destination, available power supply and required capacity in your enquiry.
What’s next for your laundry?
Let’s find the equipment that fits your project.
