Maintain an approved configuration baseline and a written change log linking each revision to the affected order. Identify who can authorise substitutions or design changes. Compare production documentation with the approved sample record before dispatch. This reduces uncertainty when machines look similar externally but contain different components or controller versions.
Keep a revision-controlled approved specification and require documented changes. This makes differences between a sample and later machines visible before they reach the distributor's customers.