List the functions and interfaces changed by each option, then review the relevant inspection and testing scope. Record the approved configuration rather than testing an unchanged standard model as a substitute. Clarify who accepts the results. Customisation should produce a traceable specification, not only a different appearance or an extra line on the quotation.
Identify which checks need repeating because of the modification. An earlier test of a standard machine may not demonstrate the behaviour of the final customised configuration.
Back to news & insights