Prepare the site before scheduling the start
Commissioning begins with readiness, not merely switching on the machines. Have qualified contractors confirm that the installed utilities, exhaust, drainage and physical installation meet the current equipment instructions. Resolve missing connections or access problems before booking a final demonstration.
Agree who will lead commissioning and what checks will be documented. Include the ordered configuration, basic operation and any agreed load trials. Keep operator familiarisation separate from technician-only work; staff should understand the limits of normal daily operation.
Leave a usable handover record
Record the machine identification, completed checks, settings that are part of the agreed handover and outstanding actions. Mark anything that could not be tested rather than leaving it implied. Give each open item a responsible person and a completion date.
Confirm where manuals, support contacts and service records will be kept. The aim is a laundry team that can operate the equipment within its instructions and recognise when assistance is needed. A handover signature should reflect the work actually completed, not simply the arrival of a service person.
Back to news & insights