Separate the machine from the project
The equipment price is only one part of an installed laundry. Build a budget with separate lines for machines, packing, transport, import-related costs, unloading, positioning and local installation. Add the utility and building work identified by your project team.
Dryer exhaust and make-up air, washer drainage and electrical works can be material items. Ask contractors to quote from current drawings rather than estimating from load capacity alone. Include commissioning and training if they are outside the manufacturer's supply scope.
Record assumptions and exclusions
Label unconfirmed figures as allowances, with an owner and a date for resolution. Avoid counting the same item twice when a supplier and contractor both mention installation. Clarify precisely where each party's responsibility ends.
Keep operating costs separate from initial installed cost, then use both when comparing options. Water, energy, labour and maintenance estimates need site-specific inputs and documented assumptions. A low machine price does not establish the lowest lifetime cost, and a higher price does not by itself prove better economics for your operation.
Back to news & insights