INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

What documents should accompany a commercial washer and dryer order?

Request current specifications, installation drawings, operating instructions and maintenance information for the ordered configuration.

Build a document list with your project team

Request current specifications, installation drawings, operating instructions and maintenance information for the ordered configuration. Ask for model and revision references so your installer can identify which documents apply. A general sales brochure rarely contains everything needed to install or operate a machine.

Include the packing list and commercial shipment documents required by the parties handling transport and import. Ask your broker and installer to identify any additional documents needed for the specific destination and project. Do not assume a generic certificate applies to every model.

Keep the operational copy accessible

Arrange for manuals in a language that the responsible staff can use. Store a controlled copy with the equipment records and make the relevant operator instructions available near the laundry. Track later updates rather than keeping several conflicting versions in circulation.

Where custom features are ordered, require the documents to describe them. Confirming the document package before dispatch helps avoid a machine arriving without the information needed for installation, staff training or a future parts enquiry.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation