Trace the route to the final position
Check the journey from the unloading point to the equipment location. Obtain packed dimensions and weight from the supplier, then compare them with doors, corridors, lifts and turning spaces. The unpacked machine dimensions alone may not describe what arrives on site.
Agree unloading, lifting and positioning responsibilities with competent contractors. Provide photographs and measured access details where useful. Do not improvise lifting methods or use the machine's visible panels as assumed lifting points; follow the manufacturer's handling instructions.
Coordinate the dates
Confirm when the building is ready to receive equipment, where it can be stored and who will inspect the shipment. Include weather exposure, access restrictions and contractor availability in the plan. A delivery date is not the same as a commissioning date.
Keep the packing list and receiving contact details available to the people handling arrival. A short pre-delivery meeting can resolve access questions while changes are still possible. Record any special arrangements in writing so the freight team, installer and site staff are working from the same instructions.
Back to news & insights