Check the site against the proposed machines
Ask your installer to review the actual electrical supply, water connections, drainage, floor requirements and dryer exhaust route. The destination country is useful context, but it does not replace measurements and utility information from your building.
For a replacement project, compare the new installation drawings with the existing arrangement. A machine with a similar load capacity may have different connection positions, access requirements or utility demand. Include delivery access and space for safe servicing in the review.
Agree the documentation and responsibilities
Before ordering, identify the manuals, labels and product documentation needed by your project team. Have the supplier confirm which documents apply to the exact equipment and configuration. Any applicable conformity requirements should be checked with an appropriately qualified adviser; a website description is not evidence of compliance.
Write down who supplies ducting, utility connections, lifting services and commissioning. A clear boundary between the machine supply and local installation work helps you compare quotations and schedule the project. Ask for unresolved items to be closed before authorising production or dispatch.
Back to news & insights