## Plan it before placing the order
The exhaust route should be reviewed while the laundry layout is still being designed. A machine that fits the floor plan may still be difficult to install if the required route, termination or access provisions cannot be accommodated.
## Give the contractor the model documents
Provide the exact dryer installation instructions and a site drawing showing the intended position. Ask a qualified contractor to design the exhaust arrangement to the manufacturer's requirements and applicable local rules. Generic internet dimensions are not a substitute for the selected model's documentation.
Coordinate the route with doors, occupied areas, neighbouring properties and future maintenance access. Identify any landlord or building approvals that must be obtained before work begins. The quotation should state whether ductwork, penetrations and commissioning checks are included. Keep the final arrangement documented for future service teams. This early coordination can reveal layout constraints while moving a proposed machine is still inexpensive, rather than after delivery when the laundry has already committed to a position and a production start date.
Back to news & insights