## Separate the finishing requirements
Towels and sheets should not automatically share one program just because both are cotton. Fabric construction, thickness, desired finish and the next production step can differ. Sheets intended for a later finishing process may have a different moisture target from towels ready for folding and storage.
## Compare complete batches
Start with care labels and the textile supplier's instructions, then establish approved programs with the equipment supplier. Keep a record of dry batch weight, program, drying time and the result after cooling. Assess several pieces from each batch, including hems and thicker areas, rather than checking a single exposed surface.
Mixed batches make troubleshooting harder because one group may be ready while another is still damp. If operational constraints require mixed work, document a specific approved combination and check its results instead of assuming any mixture will behave alike. A useful quotation therefore identifies the main textile groups and their finishing requirements. It should not reduce the whole laundry to one daily kilogram total or one claimed universal cycle time.
Back to news & insights