## Inspect before damage spreads
A small tear or loose fastening can become more troublesome during handling and processing. Sorting is an opportunity to identify items that need repair, retirement, or a separate decision before they enter the normal wash stream. Staff need practical examples of acceptable wear and unacceptable damage. Otherwise, one shift may reject items that another shift keeps processing.
## Separate quality from machine suitability
A textile can be unsuitable for a guest while still being washable, and an apparently presentable item can have a loose component that creates a handling problem. Record the reason for removal rather than using a single generic reject category. Keep held items physically separate from dirty loads awaiting washing and from clean stock. If damage increases after a process change, compare purchase age, textile construction, loading, chemicals, and handling records before blaming one machine setting. Do not repeatedly rewash an item in an attempt to hide structural damage. A simple repair or retirement decision protects stock control and prevents defective pieces from circulating through several unnecessary processing cycles.
