INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

Why does commercial laundry foam need investigation?

Record where foam appears and ask for a controlled review of the process.

## Describe the event precisely
Foam visible during washing, foam at a drain, and residue seen on finished textiles are different observations. Record the program stage, load category, detergent product, and any recent changes. Note whether the issue is limited to one batch or occurs across several normal loads. Do not add an improvised chemical to suppress foam or reach into the machine while it is operating.

## Review the approved formula
Ask the chemical supplier to check the dosing basis and suitability of the products for the machine and water conditions. Residual products arriving on textiles can also complicate an investigation, so include pre-treatment practices and customer information. Follow the equipment supplier's instructions if the machine displays a related alarm or fails to complete its normal cycle. Any revised dose or program should be evaluated on a controlled batch rather than rolled out immediately to all production. Keep a simple before-and-after record of the observation and finished quality. The purpose is to identify the cause, not merely hide a symptom until it returns on a later shift.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation