INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

Should every textile use the highest extraction setting?

Select extraction according to textile suitability and the approved program.

## Maximum is not a universal recipe
A machine's highest available extraction setting is a capability limit, not an instruction for all loads. Textile construction, embellishments, coatings, and care requirements can affect which program is suitable. Staff should choose an approved program for the category rather than increase spin simply because a load feels wet. The textile and equipment suppliers should resolve any uncertainty together.

## Investigate the reason for a change
If a routine load leaves more moisture than expected, first check that the correct program ran and whether extraction was interrupted or reduced. Record the load composition and any alarm. Compare the result with a known acceptable batch before asking for a program adjustment. For a permitted trial, examine the textiles after washing and after their normal finishing process; an apparent improvement in water removal is not enough if handling or appearance deteriorates. Keep changes under supervisor control and save the previous approved settings. This gives the laundry a reversible, documented decision instead of a sequence of informal adjustments that different operators cannot explain.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation