## Define the calculation
For a controlled trial, identify the dry mass of the same textile batch before it is processed. After the approved extraction stage, weigh the batch again using a tared container. The retained water mass is the difference between those two readings. Expressing that difference as a percentage of the dry textile mass provides a useful comparison, provided everyone uses the same definition.
## Control the trial conditions
Use the same textile category, item count, weighing equipment, and timing for each test. Include all pieces in both measurements and avoid comparing a new towel load with an older mixed batch. Record the program, extraction setting, any retries, and the time between unloading and weighing. A single test can be affected by loading variation, so repeat the comparison before making a purchasing decision. Do not claim that a measured result applies to every textile or operating condition. If the dry reference itself is uncertain, state that limitation rather than reporting an apparently precise percentage. The measurement is most useful when linked to the laundry's actual next processing step.
