## Record when the delay occurs
If filling takes longer during peak production, note which machines and other building services are operating at the same time. Record the washer program and any displayed message. A slow fill observed only under combined demand is different from a delay that occurs every time on one machine. This distinction helps the installer decide what measurements are needed.
## Request a site-level assessment
Ask qualified personnel to compare the supply conditions at the machine with the installation requirements. Operators should not alter pressure controls, remove components, or bypass fill monitoring to keep production moving. Include hose arrangements and the building supply design in the review where appropriate. The supplier should explain whether the planned number of simultaneously operating machines was considered during commissioning. After any correction, repeat a normal busy-period test instead of judging the result from one isolated cycle. Keep production estimates based on the observed full cycle, because a nominal wash-stage duration does not include unexpected filling delays or other site-dependent waiting time.
