GZP-X Commercial Tumble Dryer
Available capacities: 20 / 30 kg.

The GZP-X commercial tumble dryer series is available in 20 kg and 30 kg capacities. The product photograph shows two 20 kg machines and one 30 kg machine; these represent two capacity options.
Capacity and model differences
20 kg — GZP-20X
- Drum size (diameter × depth): 800 × 710 mm.
- Motor power: 0.2 kW.
- Electric heating power: 15 kW.
- Overall dimensions (W × D × H): 870 × 1300 × 1570 mm.
- Steam consumption listed in the brochure: 30 kg.
- Machine weight: 230 kg.
30 kg — GZP-30X
- Drum size (diameter × depth): 960 × 830 mm.
- Motor power: 0.4 kW.
- Electric heating power: 22 kW.
- Overall dimensions (W × D × H): 1050 × 1400 × 1730 mm.
- Steam consumption listed in the brochure: 40 kg.
- Machine weight: 400 kg.
Shared specifications
- Listed drying time: 40–60 minutes. Actual drying time depends on textile type, incoming moisture, load and operating conditions.
- Listed voltage: 380 V.
- Fan power: 0.55 kW.
- Steam pressure: 4–5 bar for the steam-heated configuration.
Configuration and quotation
Confirm the heating configuration, electrical supply, exhaust and make-up-air requirements for your chosen model. The brochure lists steam consumption in kg without a time basis; request the applicable operating conditions when planning utilities.
Send your required capacity, textile type and installation details for a technical sheet and quotation. Specifications are subject to change. OEM and ODM enquiries are welcome.
Need a technical data sheet? Include your destination, available power supply and required capacity in your enquiry.
What’s next for your laundry?
Let’s find the equipment that fits your project.
