Track rented bedding issues and returns by date, including weekends, weather-related changes and delayed departures. Weigh representative dry sets and separate incompatible items. Allow for inspection and storage after processing. A site occupancy figure is only a starting point; the actual return pattern determines when machines must be available.
Record the bedding actually rented and the turnover pattern. Include wet or unusually soiled returns as workload observations rather than assuming each returned set represents an identical batch.
Back to news & insights