Classify why a machine is empty: no compatible load, missing operator, downstream congestion or planned downtime. Estimate the usable production lost only where demand existed and the other stages could accept it. This avoids valuing every idle minute as lost revenue. Use the results to compare practical scheduling changes before assuming another machine is needed.
Distinguish planned spare capacity from avoidable idle time. The former can support continuity, while the latter may reveal a scheduling or material-flow problem worth correcting before expansion.