Compare moisture removal using compatible textile batches, consistent dry-weight measurements and the same method of weighing after extraction. Record the program and load composition with each result.
Different fabrics retain water differently, so a mixed batch should not be compared directly with a towel-only load. Repeat the comparison across representative batches and review the spread of results. This reveals whether an apparent improvement is consistent or simply reflects a change in what entered the machine that day.
Back to news & insights