Keep clean towels in a suitable dry storage area and avoid packing them while damp. Record the time between drying and storage, especially during humid periods. Check the storage environment separately from the dryer settings. Increasing drying time does not resolve moisture exposure after processing or contamination introduced by unsuitable handling and storage practices.
Review the storage environment and how long goods remain there. A drying program cannot compensate for every problem introduced after a correctly processed towel leaves the machine.
Back to news & insights