Separate machine consumption from building services by defining the measurement boundary before collecting data. Shared lighting, ventilation, hot-water production and other equipment can influence a whole-building meter. Use appropriate submetering or an explicitly documented allocation method.
Record which loads remain included. If a separate measurement is unavailable, describe the result as site consumption for the period rather than a precise machine efficiency figure. This distinction prevents misleading comparisons between facilities with different support systems.
Back to news & insights