Build the plan around due times rather than order size alone. Assign each order a latest processing start, including drying, finishing and dispatch preparation. Flag loads that require segregation or a special process. Review the plan when collections arrive late so a rush order does not silently displace another commitment without a revised delivery decision.
Place dispatch deadlines beside incoming quantities in the production plan. Two customers with equal weekly weights may require different capacity if one needs a much shorter turnaround.