INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

How can different incoming moisture levels change drying time?

A dryer must remove the moisture left after washing and extraction.

A dryer must remove the moisture left after washing and extraction. If that incoming moisture changes, an otherwise similar batch can need a different drying time.

Record washer program completion and load composition alongside dryer results. This prevents the dryer from being judged in isolation. When comparing equipment, use batches with a comparable starting condition and the same finished endpoint; otherwise a shorter cycle may simply indicate that less water entered the drum.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation