Extraction results depend on water leaving the machine as intended. A restricted or unsuitable drainage arrangement can interfere with normal operation, but wet loads alone do not identify the cause.
Record the program stage, any drain alarm and whether other equipment is affected. Give this information to a qualified technician together with the installation drawing. Operators should not dismantle drains or alter a program to compensate for an unresolved fault; the approved installation and service procedure remains the starting point.
Back to news & insights