Available inlet conditions and the washer's approved heating arrangement influence how the wash process is achieved. Provide measured site information and the required process to the supplier. Distinguish the central hot-water source from conditions at the machine during demand. A nominal supply temperature does not establish the heating performance of every production cycle.
Provide the proposed water supply conditions with the washer enquiry. The approved heating arrangement should reflect the real installation rather than an assumption that hot water is always available on demand.
Back to news & insights