Incoming goods and released linen can occupy circulation and machine access areas if storage is undersized. Plot expected arrivals and dispatch quantities during peaks. Assign storage locations that preserve the required separation and access. Additional equipment may worsen congestion if the layout has no place for the larger batches it will release.
Assign receiving and clean-storage zones that do not block working routes. Include peak stock levels, since a layout that works when shelves are empty may fail during busy turnover periods.
Back to news & insights