A dryer may appear slower when the incoming textiles contain more moisture, a different fabric mix or unusually bulky items. Record the washer process and the dry batch composition before comparing the dryer with earlier results.
Keep the required endpoint consistent. This does not rule out a dryer fault; it provides context for an informed assessment. If comparable loads still show an unexplained change or an alarm, use the appropriate qualified service route.
Back to news & insights