Mounting arrangements differ, so foundation, anchoring and clearance requirements must come from each model's instructions. A soft-mount description does not mean installation planning is unnecessary, and hard-mount equipment should not use another model's details by default. Have the proposed arrangement reviewed against the exact machine documentation before site work starts.
Use the instructions for the exact machine rather than a general mounting category. Suspension design does not remove the need to check the manufacturer's installation and supporting-structure requirements.
Back to news & insights