A dryer needs room for textiles to move and for heated air to reach the load. A batch that is too bulky for the drum can behave differently from a compact batch of the same dry weight.
Follow the model's loading guidance and evaluate the actual fabric mix. When reviewing uneven results, record mass and bulk rather than only the nominal capacity printed on the machine. Purchasing a larger rated dryer does not remove the need to match its usable drum space to the intended textiles.
Back to news & insights