INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

How does make-up air affect a laundry dryer installation?

Air discharged by a dryer must be considered alongside the air available to the room and equipment.

Air discharged by a dryer must be considered alongside the air available to the room and equipment. Inadequate coordination can affect operation and site conditions. Have the complete arrangement assessed by qualified personnel using the model documentation. Opening a door is not a substitute for an agreed installation design or verification of required airflow.

Assess the room and dryer together with the qualified designer. Air removed from a space needs an appropriate planned supply; an open doorway is not automatically a verified installation design.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation