Sorting determines which textiles can share an approved process and therefore shapes the batch schedule. Poor separation can create rewash or force corrections after loading. Measure sorting effort and the availability of compatible batches before each cycle. The objective is not the fewest textile groups; it is a repeatable flow that meets care requirements and delivery commitments.
Measure the time spent waiting for correctly sorted batches. Sorting is part of production capacity, and a faster washer cannot process work that has not been prepared for an appropriate program.
Back to news & insights