Allow for the open door, loading trolley, operator position and transfer of a completed batch. Check clearances against the model documentation and site access requirements. Draw the arrangement at its busiest moment. Space that appears adequate with an empty dryer can become obstructed when a full trolley and another operator arrive together.
Include the actual trolley and door movement in the layout review. An empty floor plan can look spacious while becoming congested during a normal unloading cycle.
Back to news & insights