Work backward from the uniform issue deadline and group garments by compatible care requirements. Include identification, inspection and finishing after drying. Compare the available batches with each machine's loading guidance. A daily garment count can conceal small segregated groups, so the schedule may require several processing slots rather than one nominally full load.
Work backwards from staff issue times and include the drying and finishing steps. A daily total may hide a short morning window in which most uniforms must be ready.