Provide the washer's drainage requirements and the proposed route for qualified assessment. Consider other equipment discharging into the system and the site's drainage design. Do not select a connection from pipe appearance alone. Record the approved arrangement before installation so a discharge restriction is not discovered only during a full production load.
Include simultaneous discharge conditions where relevant to the site's design. The contractor needs the actual equipment arrangement, not only the diameter of one visible drain connection.