Provide equipment schedules and connection requirements to the qualified site team for a combined demand assessment. Consider the operations that can overlap during production. Record any approved scheduling limitations. Do not infer available capacity by checking machines individually when several will fill, heat or dry at the same time.
Use a schedule showing when major loads operate together. The qualified utility review needs the combined operating pattern, not just separate specification sheets for each machine.
Back to news & insights