Compare the item's dimensions and care requirements with the model's loading guidance and usable drum space. Include the ability to move and unload the item, not just pass it through the door. Consult the equipment supplier before trialling uncertain articles. Do not establish a limit by repeatedly forcing oversized loads through the process.
Describe the largest recurring item to the supplier and request application guidance. Physical entry through the door does not establish adequate movement or a suitable finished result.
Back to news & insights