Choose commercial dryer programs from the textile care requirements and the machine's supported settings. Separate loads that need different temperature limits or endpoints rather than using one program for every fabric.
Keep the approved program list accessible to operators. When introducing a new textile, evaluate representative loads and the finished condition before adding it to routine production. Record the incoming moisture and batch size so later differences are not wrongly attributed to the program alone.
Back to news & insights