Group uniforms by compatible fibre, construction, colour and contamination, following their care instructions. Department names alone may hide different requirements. Identify garments needing a separate assessed process and keep the batch record traceable. Machine capacity should be planned around the resulting compatible loads rather than the total number of uniforms issued.
Keep special care restrictions visible during sorting. Department names can help identification, but garments from the same department may still require separate processing because their materials differ.
Back to news & insights