Map the movement of incoming textiles, released clean items, staff and trolleys using the site's process requirements. Identify crossings and shared storage points during peak work. Resolve those conflicts in the layout rather than relying only on staff memory. A machine plan should show the material flow around the equipment, not just cabinet rectangles.
Draw the movement of textiles, trolleys and people through each stage. Physical separation only works when the operating routine supports it and does not repeatedly cross the intended routes.
Back to news & insights