Separate microfiber and cotton where their care instructions or processing requirements differ. Cotton lint and incompatible chemical or temperature choices can complicate a mixed batch. Identify the textile supplier's instructions and establish a documented process for each group. Plan the resulting smaller batches when selecting equipment rather than assuming all towels form one interchangeable load.
Keep textile supplier instructions attached to the sorting standard. 'Towel' describes an application, not a single fabric specification or a universal wash and dry program.
Back to news & insights