INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

Hygienic Barrier Washer-Extractor

Available capacities: 30 / 50 / 70 / 100 / 150 kg.

Hygienic Barrier Washer-Extractor

The hygienic barrier washer-extractor is designed for hospital linen laundries with separate soiled and clean operating areas. Five capacities are available: 30, 50, 70, 100 and 150 kg.

Separate soiled and clean laundry handling

Installed through a partition, the machine allows linen to be loaded from the soiled side and unloaded from the clean side. This pass-through arrangement helps reduce cross-contamination during linen handling. The washing programme and laundry procedures must be selected for the textiles and the facility's hygiene requirements.

Shared features

  • 304 stainless steel drum, outer tub and panels.
  • Inverter-controlled drive with reversible washing and high-speed extraction.
  • PLC control with a Chinese / English touchscreen and up to 30 washing programmes.
  • Programmable washing temperature, time and water level.
  • Door safety interlocks and emergency stop switches on both sides.
  • Airbag damping system and automatic five-compartment dosing system.

Capacity and specification options

30 kg

  • Drum volume: 301 L; motor power: 4 kW.
  • Washing / distribution / intermediate extraction / high extraction speed: 40 / 60 / 340 / 680 rpm.
  • Overall dimensions (L × W × H): 1325 × 1455 × 1725 mm.
  • Machine weight: 1380 kg.

50 kg

  • Drum volume: 506 L; motor power: 5.5 kW.
  • Washing / distribution / intermediate extraction / high extraction speed: 40 / 60 / 340 / 680 rpm.
  • Overall dimensions (L × W × H): 1450 × 1700 × 1800 mm.
  • Machine weight: 1800 kg.

70 kg

  • Drum volume: 705 L; motor power: 7.5 kW.
  • Washing / distribution / intermediate extraction / high extraction speed: 40 / 60 / 340 / 650 rpm.
  • Overall dimensions (L × W × H): 1450 × 1900 × 2000 mm.
  • Machine weight: 2400 kg.

100 kg

  • Drum volume: 1000 L; motor power: 7.5 kW.
  • Washing / distribution / intermediate extraction / high extraction speed: 30 / 60 / 340 / 650 rpm.
  • Overall dimensions (L × W × H): 1450 × 2000 × 2230 mm.
  • Machine weight: 2800 kg.

150 kg

  • Drum volume: 1500 L; motor power: 18 kW.
  • Washing / distribution / intermediate extraction / high extraction speed: 30 / 60 / 340 / 650 rpm.
  • Overall dimensions (L × W × H): 1650 × 2200 × 2550 mm.
  • Machine weight: 3700 kg.

Installation and utility connections

  • Steam connection: G 3/4 inch across all five capacities.
  • Hot and cold water connections: G 1 1/2 inch for 30 / 50 / 70 kg; G 2 inch for 100 / 150 kg.
  • Compressed-air connection: 8 mm; required pressure: 0.5–0.6 MPa.

Share your required capacity, linen types, available utilities and laundry layout to request a quotation. Confirm the partition opening, service clearances, electrical supply and final configuration before installation. The photograph is representative of the series; appearance and specifications may vary by capacity and configuration.

Need a technical data sheet? Include your destination, available power supply and required capacity in your enquiry.

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation