Ask the responsible local specialist which equipment documents, inspections or approvals apply to the exact installation and intended use. Provide the proposed model, configuration and site details rather than asking only whether the brand is acceptable.
Have the supplier address the resulting requirements before order confirmation. Requirements can vary with location and project conditions, so this review should be specific and current. Do not treat a general website statement as a substitute for the necessary local assessment.