INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

Industrial Tumble Dryer

Available capacities: 50 / 70 / 100 / 120 kg.

Industrial Tumble Dryer

Programmable temperature, drying time and cooling, with a reversing drum, wide loading door and accessible lint filter. Heating and control configurations are confirmed for the selected model.

Capacity options

  • 50 kg — GZP-50; drum: 1000 L.
  • 70 kg — GZP-70; drum: 1400 L.
  • 100 kg — GZP-100; drum: 2000 L.
  • 120 kg — Request the model-specific drum volume and technical sheet.

Model selection

Select a capacity to match the washer discharge and textile volume. Drying time depends on fabric, incoming moisture and load size. Dimensions, heating, electrical supply, exhaust and make-up-air requirements vary by model. Request the current technical sheet and installation drawing. OEM and ODM enquiries are welcome.

Need a technical data sheet? Include your destination, available power supply and required capacity in your enquiry.

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation